Project case study

2D seismic for copper-gold exploration — Serbia

Field supervision of a 56 km crooked-line vibroseis programme over copper-gold exploration permits in the Timok Magmatic Complex.

Location
Timok Magmatic Complex, Serbia
Market
Critical minerals
ClearSeis role
Field supervision
Scale
56 km across four 2D profiles
Source
Vibroseis
Receivers
Wireless nodes

Project overview

Field supervision of a four-profile seismic programme in the Timok Magmatic Complex, targeting geological structure to approximately 1,500 m depth. Crooked-line vibroseis acquisition followed narrow roads through villages, with snow affecting access.

Objective

The first seismic over the permits, imaging geological structure to approximately 1,500 m for copper-gold exploration.

ClearSeis role

Field supervision: source testing, vibrator and data QC, production monitoring, daily reporting and the final report.

Programme / survey scope

Four crooked-line vibroseis profiles totalling 56 km, recorded with wireless nodes.

Operating constraints

Narrow roads through villages and snow-affected access.

Technical approach

Sweep tests established the source parameters before production. Near dwellings, vibrator drive levels were reduced rather than skipping source points, maintaining source coverage through the village sections.

Delivery

Daily vibrator and data QC, production tracking and daily reporting through acquisition, with a final report at completion.

Outcome

The programme was completed with no damage or complaints.

Relevant services

Vibroseis truck working along a dirt track between farmland and woodland.
Seismic crew assembled for a morning safety briefing before field operations.

Discuss a similar project

Tell us your target, location and project stage, and we can discuss how this experience applies.

Discuss your project