Project case study
2D seismic for copper-gold exploration — Serbia
Field supervision of a 56 km crooked-line vibroseis programme over copper-gold exploration permits in the Timok Magmatic Complex.
- Location
- Timok Magmatic Complex, Serbia
- Market
- Critical minerals
- ClearSeis role
- Field supervision
- Scale
- 56 km across four 2D profiles
- Source
- Vibroseis
- Receivers
- Wireless nodes
Project overview
Field supervision of a four-profile seismic programme in the Timok Magmatic Complex, targeting geological structure to approximately 1,500 m depth. Crooked-line vibroseis acquisition followed narrow roads through villages, with snow affecting access.
Objective
The first seismic over the permits, imaging geological structure to approximately 1,500 m for copper-gold exploration.
ClearSeis role
Field supervision: source testing, vibrator and data QC, production monitoring, daily reporting and the final report.
Programme / survey scope
Four crooked-line vibroseis profiles totalling 56 km, recorded with wireless nodes.
Operating constraints
Narrow roads through villages and snow-affected access.
Technical approach
Sweep tests established the source parameters before production. Near dwellings, vibrator drive levels were reduced rather than skipping source points, maintaining source coverage through the village sections.
Delivery
Daily vibrator and data QC, production tracking and daily reporting through acquisition, with a final report at completion.
Outcome
The programme was completed with no damage or complaints.
Relevant services


Discuss a similar project
Tell us your target, location and project stage, and we can discuss how this experience applies.